Nichols Contracting is well versed in small to mid-sized new construction projects and new additions, both commercial and residential.  Over the past twenty years we have completed from the ground up new offices, retail, elevator additions, new houses, residential additions and decks, and more.  Many of these projects were design-build, a strategy in which Nichols Contracting enjoys much success.

Selected Projects

Spring Grove Hospital Dix Building Addition
Catonsville, MD

This project consisted of three of our core areas of work, renovation, elevators, and ADA compliance.  The largest component of the project involved adding an exterior three story elevator shaft onto an existing brick veneer building.  The second component of the project involved the renovation of the existing lower level restrooms to meet ADA code compliance.  The last component of the project involved the demolition of an existing set of double doors at the basement level and the installation of a new ADA accessible door activated by an automatic door operator.  The project was delivered on time to the satisfaction of NCI and our client.

Ashton Hardware Store
Sandy Spring, MD

The project consisted of renovating an abandoned 8,000sf building on a 2 acre project site to become the new location of Ashton Paint & Hardware.  The existing building was demolished down to the structural components and rebuilt from the ground up.

 

Nichols Contracting New Office
Sandy Spring, MD

The project consisted of renovating an abandoned 8,000sf building on a 2 acre project site to become our new company office headquarters.  The existing building was demolished down to the structural components and rebuilt from the ground up.

 

VA Medical Center – Building 4R
Perry Point, MD

With one of our several veteran owned business allies and clients, Nichols Contracting built an elevator addition to Building 4R at the VA Hospital in Perry Point, MD.  Nichols Contracting provided the demo, excavation, concrete, masonry, steel, doors, painting, and interior lobby finish work for this project.  We demoed the existing porch and built the new porch, elevator shaft and machine room.  At our steel shop, we fabricated the railings and canopy and then installed on site.  The VA is detailed and strict with respect to conformance of their specifications and Nichols Contracting worked diligently to adhere to their standards.

Recently Completed Projects

09/06/2012 – Weight Watchers Tenant Fitout, Catonsville, MD
05/31/2012 – Health Management TI, Sandy Spring, MD
03/20/2012 – ATK 5030 Renovation, Beltsville, MD
02/02/2012 – AMI Tenant Improvement, Sandy Spring, MD
11/08/2011 – Randolph Medical Center, Enterprise Dental Lab, Rockville MD
10/01/2011 – CSSG Room B2N187, Sandy Spring, MD
09/01/2011 – Echelon Academy TI, Sandy Spring, MD
06/28/2011 – 8229 Boone Blvd Suites 330 & 365, Vienna, VA
05/03/2011 – 3900 Watson Place Gym TI, Washington, DC
01/01/2011 – Mertz Tenant Fitout, Ashton, MD
12/31/2010 – Hickory Ridge Tenant Fitout, Sandy Spring, MD
12/23/2010 – Rosselle Tenant Fitout, Sandy Spring, MD
10/27/2010 – Valois Tenant Fitout, Ashton, MD
06/27/2010 – Bawek Dance Studio, Sandy Spring, MD